RivaBOILER INSTALLATION, OPERATIONINSTRUCTIONSRivaADVANCE SVWALL HUNG GAS BOILER FORCENTRAL HEATING SUPPLYPlease Read Instructions CarefullySave for F
10 RIVA ADVANCE SV MANUAL3. Parts ListPrimary Components:101114151213171819202122161278945631 Central heating pressure relief valve2 Condensing h
RIVA ADVANCE SV MANUAL 114. Internal Piping & Parts List181422831921293027736 353738393233343115132698122510232414620Note: Pressure Relief Valv
12 RIVA ADVANCE SV MANUAL5. Electric DiagramsCaution:Label all wires prior to disconnection when servicing controls. Wiring errors can ca
RIVA ADVANCE SV MANUAL 135. Electric Diagrams Cont.5.1 Sequence of Operation:Is boiler locked out?NOSwitch in thefunctionmodeTa kingwaterfromthe dom
14 RIVA ADVANCE SV MANUAL5. Electric Diagrams Cont.lockmemorised?NOSwitch in thefunctionmodeTa kingwaterfromthe domestic hotwatercircuit?Requestfor
RIVA ADVANCE SV MANUAL 156. Installation LocationThe installation location chosen must:• Comply with all clearances listed below.• Provide suitabl
16 RIVA ADVANCE SV MANUAL7. Exhaust Pipe LocationCAUTIONEXTERNAL VENT SURFACES ARE HOT.IT IS RESPONSABILITY OF THE HOMEOWNER TO KEEP THE VENTTERMINA
RIVA ADVANCE SV MANUAL 178. Mounting BracketAfter a suitable installation location is chosen, verify that the mounting wall is properly braced and s
18 RIVA ADVANCE SV MANUAL9. VentingThe Riva Advance SV is a mechanical draft, side wall vented boiler. There are two side wall ue options available
RIVA ADVANCE SV MANUAL 19The Commonwealth of Massachusetts requires compliance with regulation 248 CMR 4.00and 5.00 for installation of through – the
2 RIVA ADVANCE SV MANUALDear Customer:Thank you for buying a Biasi Riva Advance SV.The Riva Advance SV is a high efciency condensing, wall mounted g
20 RIVA ADVANCE SV MANUAL9. Venting Cont.9.1 Fitting the ue system:In general, it has to be taken in consideration that the horizontal sections o
RIVA ADVANCE SV MANUAL 219. Venting Cont.B Riser coaxial horizontal ue kit (Exhaust & intake outside)Figure 9.2 (Coaxial 2.4/4.0 inches – nom
22 RIVA ADVANCE SV MANUAL9. Venting Cont.C Standard separate horizontal ue kit (Exhaust & intake outside) - Part# RI-9990393Figure 9.3 (Twin
RIVA ADVANCE SV MANUAL 239. Venting Cont.D Alternative separate kit (Exhaust & intake outside) - Part# RI-9990393Figure 9.4 (Twin Pipe Ø 3.25
24 RIVA ADVANCE SV MANUALE Standard Vertical-roof kit (Exhaust & intake outside) - Part# RI-9990392Figure 9.5 (vertical pipe Ø 3.1 / Ø 4.9 in)T
RIVA ADVANCE SV MANUAL 259. Venting Cont.F Plastic vent requirementsAll piping that is used to vent the Riva Advance Combi boiler must conform to th
26 RIVA ADVANCE SV MANUAL9. Venting Cont.G PVC boiler adapter - Part# RI-99909120Figure 9.6 This kit is required to vent the Riva Advance Combi boi
RIVA ADVANCE SV MANUAL 279. Venting Cont.H PVC concentric vent kit - Part# RI 3PPS-HKFigure 9.7 (Equivalent length - 5’)This kit allows horizontal
28 RIVA ADVANCE SV MANUAL9. Venting Cont.I PVC roof vent kit - Part# RI 3PPS-VKFigure 9.8 (Equivalent length - 9’)This kit allows vertical ter
RIVA ADVANCE SV MANUAL 299. Venting Cont.J Polypropylene chimney liner kit Part#This kit allows for venting of the boiler through an existing chimn
RIVA ADVANCE SV MANUAL 3Table of ContentsSection Title Section Number Page NumberWarning - 5-6Important Information - 7General Information 1 8
30 RIVA ADVANCE SV MANUAL9. Venting Cont.K Plastic separate vent kitFigure 9.10 This kit allows horizontal termination of the ue pipe using 3” Pla
RIVA ADVANCE SV MANUAL 3110. Pipe ConnectionsThe Riva Advance SV is supplied with a 3/4” stainless steel gas pipe (A in gure 10.1), 3 - 3/4” copper
32 RIVA ADVANCE SV MANUALThe hot water tank must be positioned under the boiler as shown in Figure 10.2.Figure 10.2 MRMBESRRConnect the tank serpenti
RIVA ADVANCE SV MANUAL 3310. Pipe Connections Cont.To activate the Antilegionella function, the tank must be integrated with an NTC probe, posit
34 RIVA ADVANCE SV MANUAL10. Pipe Connections Cont.• Press the reset button 12 in Figure 10.6 to scroll the various parameters until reach-ing param
RIVA ADVANCE SV MANUAL 3511. Gas Pipe ConnectionsGas supply piping is to be sized and installed properly in order to provide a supply of gas suf-cie
36 RIVA ADVANCE SV MANUAL12. Electrical Connections/WiringRemoving Front Panel:• Remove the front panel by removing screws A and slid-ing th
RIVA ADVANCE SV MANUAL 3712.3 Room Thermostat Connection:• The room thermostat must be connected to the terminal block situated next to the control
38 RIVA ADVANCE SV MANUAL12. Electrical Connections/Wiring Cont.12.5 Finishing:• Route the electrical supply cord and the external control cord as i
RIVA ADVANCE SV MANUAL 3912. Electrical Connections/Wiring Cont.12.7 Electric connection between the boiler and the external probe:When connecting
4 RIVA ADVANCE SV MANUALTable of ContentsSection Title Section Number Page NumberCommissioning 15 52-62For Proper System Operation, Make Sure Tha
40 RIVA ADVANCE SV MANUAL12. Electrical Connections/Wiring Cont.The path of the external probe wires or cable must follow the indicated path and
RIVA ADVANCE SV MANUAL 41The path of the electric power supply wires or cable of the boiler and the remote control must follow the indicated path
42 RIVA ADVANCE SV MANUAL12. Electrical Connections/Wiring Cont.• Press the buttons or to display the programming “PM15” external probe enab
RIVA ADVANCE SV MANUAL 4312. Electrical Connections/Wiring Cont.• Connect terminals T1 and T2 on the ter-minal board with the two electric wires as
44 RIVA ADVANCE SV MANUAL12. Electrical Connections/Wiring Cont.• Press the reset button 12, in Figure 12.23 multiple times to scroll the vario
RIVA ADVANCE SV MANUAL 4512. Electrical Connections/Wiring Cont.• Press the reset button 12, in Figure 12.23 multiple times to scroll the vario
46 RIVA ADVANCE SV MANUAL12. Electrical Connections/Wiring Cont.The following table shows the correlation between the boiler knob setting 10 in
RIVA ADVANCE SV MANUAL 4713. Circulator Sizing13.1 Circulator capacity as a function of ow rate:Figure 13.1 The hydraulic specication in Fig 13.1
48 RIVA ADVANCE SV MANUAL14. PipingAll external piping components are to be supplied by the installer. It is very important to use a primary secondar
RIVA ADVANCE SV MANUAL 4914.1 Primary – Secondary Piping:All external piping components are to be supplied by the installer.It is very important to u
RIVA ADVANCE SV MANUAL 5WARNINGBoiler is certied as an indoor appliance. Do not install boiler outdoors or locate where it will be exposed to freezi
50 RIVA ADVANCE SV MANUAL14.2 Primary – Secondary Piping with Zone Valves:All external piping components are to be supplied by the installer.It is ve
RIVA ADVANCE SV MANUAL 5114.3 Manifold Piping with Zone Valves (shown conn. to radiators):All external piping components are to be supplied by the in
52 RIVA ADVANCE SV MANUAL15. Commissioning15.1 For proper system operation, make sure that:• System lling and top ups will be done using so
RIVA ADVANCE SV MANUAL 5315. Commissioning Cont.• Reassemble the front panel of the case.• Return ll valve to automatic position.• Unscrew the c
54 RIVA ADVANCE SV MANUAL15. Commissioning Cont.Figure 15.5 Figure 15.6 8 7 6The LCD display shows the sequence in Fig-ure 15.7.15.4 Lighting the bo
RIVA ADVANCE SV MANUAL 5515. Commissioning Cont.15.5 Checking the gas pressure at the burner:This boiler has been tested to the highest quality cont
56 RIVA ADVANCE SV MANUAL15. Commissioning Cont.Figure 15.9 8 7 6 • Electrically power the boiler, the following will appear on the LCD display.F
RIVA ADVANCE SV MANUAL 5715. Commissioning Cont.Figure 15.15 • Make sure that the display is indicating a heat request.• Collect a large amount
58 RIVA ADVANCE SV MANUAL15. Commissioning Cont.the table CO2 at Q. min. in the section “Technical Information” page 9.• Close the domestic ho
RIVA ADVANCE SV MANUAL 5915. Commissioning Cont.sequence P01 alternates with -- -- --).Figure 15.23 • Press the reset button 6, in Figure 15.21, to
6 RIVA ADVANCE SV MANUALWARNINGAny appliance that burns natural gas, propane gas, fuel oil, wood or coal is capable of pro-ducing carbon monoxide (CO
60 RIVA ADVANCE SV MANUAL15. Commissioning Cont.Figure 15.29 Turning knob 7 can change the heating de-livery temperature ±15°C with respect to the o
RIVA ADVANCE SV MANUAL 6115. Commissioning Cont.15.8 Labels placement:Figure 15.33 14235Warning: The installation is not complete unless labels sup
62 RIVA ADVANCE SV MANUALFigure 15.34 Flue analysis points15. Commissioning Cont.15.10 Instructing the user:• Hand over the User manual, this Insta
RIVA ADVANCE SV MANUAL 6316. Gas ConversionWARNINGS: Procedures to adapt the boiler to the type of gas available must be car-ried out by a competent
64 RIVA ADVANCE SV MANUAL16. Gas Conversion Cont.gas circuit check all the connections for gas tightness (Figure 16.1).The factory boiler is set
RIVA ADVANCE SV MANUAL 6516. Gas Conversion Cont.The following table summarises the correla-tion between gas type, knob set, LCD dis-play.GASK
66 RIVA ADVANCE SV MANUAL16. Gas Conversion Cont.Figure 16.13 • To exit programming, position the func-tion selector 7 to “ “ (Figure 16.
RIVA ADVANCE SV MANUAL 6717. Annual Maintenance17.1 Warnings:The procedures detailed in this chapter must be carried out only by a professionally qua
68 RIVA ADVANCE SV MANUAL17. Annual Maintenance Cont.17.4 Emptying the Domestic Hot Water circuit:• Close the inlet valve• Open the system domestic
RIVA ADVANCE SV MANUAL 6917. Annual Maintenance Cont.rear side of the connector (Fig. 17.7).Figure 17.7 (rear view of the fan)LMIf you notice dirt o
RIVA ADVANCE SV MANUAL 7IMPORTANT INFORMATIONPlease read this page carefully.• ALL BOILERS MUST BE INSTALLED IN ACCORDANCE WITH NATIONAL, STATE AND
70 RIVA ADVANCE SV MANUAL17. Annual Maintenance Cont.17.13 Water inhibitor concentration:Where chemical products are used the level of water treatmen
RIVA ADVANCE SV MANUAL 7117. Annual Maintenance Cont.rameter P01 appears on the LCD display; the following will appear on the LCD dis-play (the seque
72 RIVA ADVANCE SV MANUAL17. Annual Maintenance Cont.on alternately.Figure 17.15 • The heating thermal power can be changed by turning the hot
RIVA ADVANCE SV MANUAL 7317. Annual Maintenance Cont.17.16 Checking the magnesium anode :To guarantee constant protection against the electrochemical
74 RIVA ADVANCE SV MANUAL18. Vent Part Spares18.1 Separate venting:Description Order NumberTwin pipe kit 10999.0393.0For any spare parts, please cont
RIVA ADVANCE SV MANUAL 7518. Vent Part Spares Cont.18.2 Coaxial venting:Description Order NumberCoaxial ue kit 10999.0387.0For any spare parts, plea
76 RIVA ADVANCE SV MANUAL18. Vent Part Spares Cont.18.3 Roof ventingPart Description Order NumberA Roof ue kit 10999.0392.0For any spare parts, plea
RIVA ADVANCE SV MANUAL 7718. Vent Part Spares Cont.18.4 Separate PVC venting:For any spare parts, please contact QHT Inc. at 800-501-7697.Description
78 RIVA ADVANCE SV MANUAL18. Vent Part Spares Cont.18.5 PVC Sidewall venting:For any spare parts, please contact QHT Inc. at 800-501-7697.Description
RIVA ADVANCE SV MANUAL 7918. Vent Part Spares Cont.Description Order NumberPVC Boiler Adapter RI - 10 088518.6 PVC Roof venting:For any spare parts,
8 RIVA ADVANCE SV MANUAL1. General Information2. Technical Information (M210.32 CV)The Riva Advance SV is a high efciency condensing, wall mounted
80 RIVA ADVANCE SV MANUAL19. Installer NotesSystem Checkout:Boiler Model No. ___________________Original Purchaser:__________________________________
RIVA ADVANCE SV MANUAL 81NOTE
82 RIVA ADVANCE SV MANUALNOTE
*1796220670*17962.2067.0 2712 84A4 USA09/07 2012N
RIVA ADVANCE SV MANUAL 92. Technical Information Cont.ENERGY CAPACITYNominal heat input(0/2000 ft)MBH 116.0Nominal heat input (2000/4500 ft)MBH 110.
Comments to this Manuals